The Lodge
Auto-generated from your meeting summaries. 9 pages across 4 topics.
API Migration Status
The ongoing migration from v2 to v3 API is tracked across the Q1 sprint. Current state: 85% complete. Remaining work co…
Enterprise SSO Rollout
SAML and OIDC support has been prioritised above the onboarding redesign following sales pipeline discussions with Acme…
Rate Limiter Incident (v3.4.2)
Misconfigured rate limiter deployed in v3.4.2 caused cascading 5xx responses under load. 47 minute outage. Mitigations:…
Dashboard Redesign — Option B Selected
Three layouts reviewed: list, card-based, and hybrid. The card-based Option B was selected for mobile responsiveness an…
Onboarding Redesign Deprioritised
Q2 target. The enterprise SSO workstream has taken both engineers originally assigned to onboarding. Scope will be revi…
Acme Corp Enterprise Pilot
Acme Corp's VP of Engineering expressed strong interest in the enterprise tier. Requirements: SSO, audit logs, API acce…
TechStart Onboarding Playbook
TechStart walked through account setup, calendar integration, and team management. Auto-join configured for their daily…
March MRR Update
MRR grew 18% to $47K. Active accounts at 1,200 (+22% MoM). Enterprise pipeline: 8 qualified leads. Series A target Q3 2…
Hiring Plan — Enterprise AEs
⚠Two enterprise AEs to be hired by end of April. Target $75K MRR before Series A conversations. Recruitment via Sequoia …